After changing the suspensiona lot of toe on the front and rear was induced, which had to be reset. We used the DIY string method to measure the alignment knowing that we just wanted to get it roughly aligned initially. The wider rear track of the Boxster and narrowing body lines are deceptive when you look at the alignment by eye.
First we set the ride height getting the car level all round. This is done using the adjustable spring perches on the suspension and measuring the ride height under each jacking point.
We then setup equal length parallel fishing lines running down the side of the car, equidistant across the front and back. We measured the distance between the front and rear rim of each wheel and the parallel line - the difference being any toe in or out.
After several adjustments we managed to get the alignment where we wanted it (which is not far off 0 / straight) and also maintained a good amount of camber (-3 degrees on the rear and -1.75 degrees on the front).
Adjustable 911 GT3 lower arms are an option to achieve more front end camber - but these remain a luxury (that we can't currently afford).
Sunday, 26 February 2012
Seats & Harnesses
With the dashboard and instruments back in place the car re-started first time which was very good news. i.e. We had re-connected all the wiring and not cut out anything too important!
Focus turned to re-fitting the seats. The bolts for these are very awkward to reach now the roll cage is in place.
Luke 3" wide 6 point FIA spec harnesses have been installed and adjusted to fit. Roll cage padding has been placed in a few areas to stop us baning our heads/helmets on the roll cage and provide a little bid of elbow padding.
A removable steering wheel boss has also been added to make getting in and out of the car easier.
Focus turned to re-fitting the seats. The bolts for these are very awkward to reach now the roll cage is in place.
Luke 3" wide 6 point FIA spec harnesses have been installed and adjusted to fit. Roll cage padding has been placed in a few areas to stop us baning our heads/helmets on the roll cage and provide a little bid of elbow padding.
A removable steering wheel boss has also been added to make getting in and out of the car easier.
Sunday, 1 January 2012
Dashboard refitting
Before the dashboard could be re-fitted the relay board was re-attached to its original mounting bracket on one side and cable tied to the rollcage as high up as possible. This will keep it away from the drivers feet and accelerator pedal. The fuse box could not go back in its original position so it has been moved and mounted to the rollcage on drivers door side, again using strong cable ties.
The wiring looms running down the sides of the car were also tidied up and the plastic trim refitted to protect the wiring. The heater box was modified to fit around the rollcage and re-fitted. The recirculation flap & motor had to be removed. It should function well enough to provide cold and hot air to the interior and windscreen when needed.
The interior pull cable and fire extingusher wiring was run through the bulkhead to the battery area before the dashboard was trimmed and re-fitted. Two inches were cut from each side allow it to fit inside the rollcage.
The wiring looms running down the sides of the car were also tidied up and the plastic trim refitted to protect the wiring. The heater box was modified to fit around the rollcage and re-fitted. The recirculation flap & motor had to be removed. It should function well enough to provide cold and hot air to the interior and windscreen when needed.
Rollcage Painting
The car was masked inside and out with paper and sheets to prevent overspray, then we set about the difficult task of painting the rollcage. It took a whole day to complete the job.
The rollcage had two coats of Halfords grey primer followed by two coats of satin black. In all it took 9 cans of paint, and there are still some difficult to get to areas which need to be touched up.
The end result with the rollcage painted black.
The rollcage had two coats of Halfords grey primer followed by two coats of satin black. In all it took 9 cans of paint, and there are still some difficult to get to areas which need to be touched up.
The end result with the rollcage painted black.
Sunday, 20 November 2011
Rollcage Update
The rollcage took longer than expected to be delivered, but is now fully fitted and ready to be painted before we re-assemble the race interior.
The wiring loom on the left and right hand sides (including the relay board and fusebox) have to be re-attached. The heater unit from under the passenger side dashboard also needs to to be re-installed with appropriate modification to fit around the rollcage bars.
The wiring loom on the left and right hand sides (including the relay board and fusebox) have to be re-attached. The heater unit from under the passenger side dashboard also needs to to be re-installed with appropriate modification to fit around the rollcage bars.
Labels:
rollcage
Sunday, 16 October 2011
Roll Cage
All of the remaining interior trim and dashboard elements have been removed to allow the installation of the rollcage.
The dashboard took a morning to remove and was quite straightforward. How easily it goes back in remains to be seen!
Off we go on our first towing experience!
The dashboard took a morning to remove and was quite straightforward. How easily it goes back in remains to be seen!
The car was winched onto a trailer we hired for the day. We took it to Roll Centre who are fitting the cage for us. The car is so low that extra ramps were needed to reduce the angle onto the trailer and stop the car grounding.
The car had to be put onto the trailer backwards in the end so the weight distrubution was correct. The trailer bed should be flat under its own weight and the hitch end still be able to be lifted easily.Off we go on our first towing experience!
Labels:
modifications,
rollcage,
trailer
Subscribe to: